Work Item
ASTM WK89797
Revision of F3533/F3533M-23 Standard Guide for Inspection and Acceptance of Installed Thermoplastic Storm and Sanitary Sewer Pipe
Rationale
The scope provides a general overview of the standard; specific aspects of options or caveats are generally discussed under appropriate sections of the standard. As such, the further discussion of inspection period has been deleted from 1.2 and moved to Note 2, where it is discussed in more detail under the appropriate section.
Work Item Status
Date Initiated: 02-24-2024
Technical Contact: John Kurdziel
Item: 018
Ballot: F17 (24-07)
Status: Negative Votes Need Resolution
Item: 003
Ballot: F17.62 (24-03)
Status: Will Reballot Item